{"id":7741,"date":"2025-01-19T00:05:07","date_gmt":"2025-01-18T20:35:07","guid":{"rendered":"https:\/\/niazit-ceiling.com\/en\/?p=7741"},"modified":"2026-02-06T12:43:30","modified_gmt":"2026-02-06T09:13:30","slug":"how-to-install-niazit-ceiling","status":"publish","type":"post","link":"https:\/\/niazit-ceiling.com\/en\/how-to-install-niazit-ceiling\/","title":{"rendered":"NIAZIT Joist Installation Guidelines"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"7741\" class=\"elementor elementor-7741 elementor-2387\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-31c997f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"31c997f\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-no\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-212c5a3\" data-id=\"212c5a3\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-29515b0 elementor-widget elementor-widget-text-editor\" data-id=\"29515b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<section class=\"popover flex h-full w-full flex-col bg-transparent\"><section class=\"relative flex min-h-0 flex-auto grow flex-col overflow-hidden\"><div class=\"block h-auto\"><div class=\"h-full w-full\"><div class=\"flex h-full justify-center\"><div class=\"z-0 flex w-full flex-col items-center\"><div id=\"prosemirror-editor-container\" class=\"relative z-10 flex max-w-full h-fit\"><h2 dir=\"ltr\">\u2728 NIAZIT Joist Installation Guidelines (NIAZIT OWSJ Roof System) \u2728<\/h2><h3 dir=\"ltr\">Installation on Reinforced Concrete Frames<\/h3><ol dir=\"ltr\" start=\"1\" data-spread=\"false\"><li><p>The use of <strong>transverse ties (bridging)<\/strong> is mandatory. Each tie consists of two rebars with a minimum diameter of 12 mm: one placed on the bottom chord and one below or on the top chord, parallel to each other and perpendicular to the joists, connected using <strong>soft binding wire<\/strong>.<\/p><\/li><li><p>For spans shorter than 3 m, installing <strong>temperature reinforcement<\/strong> and tying it to the joist (T\u2011section) is sufficient; transverse ties are not required.<\/p><\/li><li><p>For spans of 3\u20135.5 m, use one row of transverse ties; for spans greater than 5.5 m, use two rows. The spacing between adjacent ties shall not exceed 2.5 m.<\/p><\/li><li><p><strong>Shrinkage and temperature reinforcement<\/strong> shall be installed at 25 cm spacing, perpendicular to the joist direction, using 6, 8, or 10 mm diameter rebars.<\/p><\/li><li><p>When temperature ties are used, they must be kept in tension to prevent protrusion during concreting and to restrain joist movement.<\/p><\/li><li><p>For larger spans in concrete structures, due to compressive forces in fresh concrete, the use of one or two rows of <strong>temporary props<\/strong> during concreting is recommended.<\/p><\/li><li><p>The NIAZIT roof system <strong>does not require U\u2011bars (odka) or negative moment reinforcement<\/strong>.<\/p><\/li><li><p>NIAZIT joists <strong>do not require web concrete<\/strong>; approved blocks may be used adjacent to internal elements.<\/p><\/li><\/ol><\/div><\/div><\/div><\/div><\/div><\/section><\/section>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-60714cd elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"60714cd\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-no\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-f67af8f\" data-id=\"f67af8f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-156fd2a elementor-widget elementor-widget-image\" data-id=\"156fd2a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"640\" height=\"180\" src=\"https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-con-structure.png\" class=\"attachment-full size-full wp-image-3458\" alt=\"\" srcset=\"https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-con-structure.png 640w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-con-structure-500x141.png 500w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-con-structure-300x84.png 300w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-con-structure-150x42.png 150w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-con-structure-480x135.png 480w\" sizes=\"(max-width:767px) 480px, 640px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-02d8e0d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"02d8e0d\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-no\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-0b9980c\" data-id=\"0b9980c\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-8653b23 elementor-widget elementor-widget-text-editor\" data-id=\"8653b23\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<section class=\"popover flex h-full w-full flex-col bg-transparent\"><section class=\"relative flex min-h-0 flex-auto grow flex-col overflow-hidden\"><div class=\"block h-auto\"><div class=\"h-full w-full\"><div class=\"flex h-full justify-center\"><div class=\"z-0 flex w-full flex-col items-center\"><div id=\"prosemirror-editor-container\" class=\"relative z-10 flex max-w-full h-fit\"><div dir=\"ltr\" contenteditable=\"false\">\u00a0<\/div><h3 dir=\"ltr\">Installation on Steel Frames<\/h3><ol dir=\"ltr\" start=\"1\" data-spread=\"false\"><li><p>Transverse ties are mandatory and consist of two rebars (minimum 12 mm) welded to the joists, placed on the bottom and top chords, perpendicular to the joist direction.<\/p><\/li><li><p>For spans less than 3 m, temperature reinforcement welded to the joist (T\u2011section) is sufficient; transverse ties are not required.<\/p><\/li><li><p>Use one row of ties for spans of 3\u20135.5 m and two rows for spans greater than 5.5 m; maximum spacing is 2.5 m.<\/p><\/li><li><p>Shrinkage and temperature reinforcement at 25 cm spacing using 6, 8, or 10 mm rebars. Up to 4.5 m spans, tying with wire is acceptable; for larger spans, <strong>welding to the top chord is mandatory<\/strong>.<\/p><\/li><li><p>Temperature ties must be tensioned to prevent displacement during concreting.<\/p><\/li><li><p>No bearing reinforcement or negative moment bars are required in the NIAZIT system.<\/p><\/li><li><p>Web concrete is not required; approved blocks may be used.<\/p><\/li><\/ol><\/div><\/div><\/div><\/div><\/div><\/section><\/section>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2bfe1a8 elementor-widget elementor-widget-image\" data-id=\"2bfe1a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"638\" height=\"131\" src=\"https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-st-structure.png\" class=\"attachment-full size-full wp-image-3460\" alt=\"\" srcset=\"https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-st-structure.png 638w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-st-structure-500x103.png 500w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-st-structure-300x62.png 300w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-st-structure-150x31.png 150w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-st-structure-480x99.png 480w\" sizes=\"(max-width:767px) 480px, 638px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-a1fcf4c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"a1fcf4c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-no\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-069461a\" data-id=\"069461a\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-0369319 elementor-widget elementor-widget-text-editor\" data-id=\"0369319\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<section class=\"popover flex h-full w-full flex-col bg-transparent\"><section class=\"relative flex min-h-0 flex-auto grow flex-col overflow-hidden\"><div class=\"block h-auto\"><div class=\"h-full w-full\"><div class=\"flex h-full justify-center\"><div class=\"z-0 flex w-full flex-col items-center\"><div id=\"prosemirror-editor-container\" class=\"relative z-10 flex max-w-full h-fit\"><h3 dir=\"ltr\">Installation on Load\u2011Bearing Walls<\/h3><ol dir=\"ltr\" start=\"1\" data-spread=\"false\"><li><p>Transverse ties (two rebars \u226512 mm) welded perpendicular to the joists are mandatory.<\/p><\/li><li><p>For spans below 3 m, temperature reinforcement welded to the joist (flat bar and T\u2011section) is sufficient; hidden transverse ties are not required.<\/p><\/li><li><p>One row of ties for spans of 3\u20135.5 m and two rows for spans above 5.5 m; spacing \u22642.5 m.<\/p><\/li><li><p>Shrinkage and temperature reinforcement at 25 cm spacing with 6, 8, or 10 mm rebars. Wire tying is sufficient up to 4.5 m; beyond this, <strong>welding to the top chord is mandatory<\/strong>.<\/p><\/li><li><p>Temperature ties must be tensioned to prevent movement during concreting.<\/p><\/li><li><p>For spans greater than 5 m, one row of <strong>temporary props<\/strong> is essential to prevent joist torsion during concreting.<\/p><\/li><li><p>No bearing or negative moment reinforcement is required.<\/p><\/li><li><p>Web concrete is not required; approved blocks may be used.<\/p><\/li><\/ol><\/div><\/div><\/div><\/div><\/div><\/section><\/section>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-6c8a41a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"6c8a41a\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-no\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-3bfcaff\" data-id=\"3bfcaff\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-4f28458 elementor-widget elementor-widget-image\" data-id=\"4f28458\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"568\" height=\"562\" src=\"https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-wall-structure.png\" class=\"attachment-full size-full wp-image-3462\" alt=\"\" srcset=\"https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-wall-structure.png 568w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-wall-structure-500x495.png 500w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-wall-structure-300x297.png 300w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-wall-structure-76x75.png 76w, https:\/\/niazit-ceiling.com\/wp-content\/uploads\/2025\/01\/install-wall-structure-480x475.png 480w\" sizes=\"(max-width:767px) 480px, 568px\" title=\"\">\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>\u2728 NIAZIT Joist Installation Guidelines (NIAZIT OWSJ Roof System) \u2728 Installation on Reinforced Concrete Frames The use of transverse ties (bridging) is mandatory. Each tie consists<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":3462,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[],"class_list":["post-7741","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/posts\/7741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/comments?post=7741"}],"version-history":[{"count":0,"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/posts\/7741\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/media\/3462"}],"wp:attachment":[{"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/media?parent=7741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/categories?post=7741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/niazit-ceiling.com\/en\/wp-json\/wp\/v2\/tags?post=7741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}